Colocation Pricing Explained: Rack Fees, Power Commitments, Energy and Network Charges
Colocation pricing starts with a capacity rate for space and reserved power, plus a separate charge for the metered energy. Coloprice puts the wholesale average at $196 per kW per month across primary North American markets from the second half of 2025 through June 2026, before metered power.
The published rate understates the monthly bill, because a deployment also pays for energy, network connections and one-time setup. Retail quotes price capacity per rack and wholesale quotes per kW, so the unit changes with deployment size.
What a Colocation Quote Contains
Morgan Lewis, a law firm, splits colocation charges into monthly recurring charges (MRCs) and one-time non-recurring charges (NRCs). Its recurring charges cover five items:
- Space: the charge for the cabinet, cage or suite.
- Power and utility costs: often the largest line, quoted in dollars per kW against committed power, the kW reserved and billed regardless of use, or against metered use.
- Connectivity fees: a monthly fee for each cross-connect, a dedicated cable from the tenant's equipment to a carrier, cloud provider or another tenant in the building.
- Taxes: local taxes the provider adds to the recurring charges.
- Remote hands: on-site technicians who rack equipment, reseat cables or restart servers, billed hourly or as a monthly block of hours.
Connectivity fees recur each month, so a deployment linked to many carriers and clouds keeps paying them for the life of the contract.
Stacked AI, a data center advisory firm, lists three one-time charges:
- Build-out: construction of a cabinet or cage, with a higher charge for a private cage.
- Installs: setup of power circuits and network connections.
- Cabling: cable runs inside the cabinet or cage.
Stacked AI ranks these one-time charges as the most negotiable part of a deal, because waiving them leaves the provider's recurring revenue untouched. Two quotes with the same headline rate can put different charges in each column, so compare the totals over the contract term.
What a Colocation Rack or Kilowatt Costs: Published Benchmarks
Wholesale and retail colocation use different pricing units.
Inflect, a colocation marketplace, puts wholesale at blocks of roughly 250 kW and up, priced per kW per month, and retail below that line, priced per rack or cabinet. Stacked AI calls dollars per kW per month the standard colocation rate.
Two per-kW quotes compare fairly when each one states whether the rate is committed or metered and whether it includes cooling.
The benchmarks below come from Coloprice, which sources them to CBRE, a commercial real estate firm, and measures wholesale as committed IT load, the power reserved for the tenant's equipment.
| Market or tier | Unit | Figure | What it excludes |
|---|---|---|---|
| Primary North American markets (wholesale average) | $/kW/month | $196 | Metered power |
| Northern Virginia (wholesale) | $/kW/month | $173 | Metered power |
| Singapore (wholesale) | $/kW/month | $403 | Metered power |
| North American retail (3 to 5 kW rack) | $/rack/month | $500 to $1,500 | Metered power |
The retail range works out to roughly $100 to $500 per kW per month: $500 over 5 kW at the low end, $1,500 over 3 kW at the high end.
Inflect's pricing guide treats CBRE's average as a base rate for space and rent. Inflect adds power delivery and cooling to reach an all-in figure closer to $250 per kW per month for most deployments.
Colocation Power Commitments, Metering and Energy
A provider bills power at a flat rate on the committed kW or on metered use, Ascendant USA's pricing guide explains. Draw above the contract's threshold triggers an overage charge.
NVIDIA's GB200 NVL72 rack holds 72 GPUs. Uptime Institute estimates its draw can climb from about 60 to 70 kW to more than 150 kW in a spike, above the rack's 132 kW rating.
Ask how often the provider measures draw, because a short interval can turn those spikes into overage charges.
Both billing models charge metered energy outside the capacity rate, and both published benchmarks above exclude that energy. Power usage effectiveness (PUE), the facility's energy use divided by the energy reaching IT equipment, measures the cooling and conversion overhead on each kWh.
Morgan Lewis advises defining PUE in the colocation agreement. Average PUE stood at 1.52 in Uptime Institute's 2026 survey analysis, so a typical facility draws about 1.52 kWh at the meter for each kWh reaching IT equipment.
Equipment datasheets list power in watts or amps, as Volico, a colocation provider, explains. The amp figure tells the facility how much current the equipment pulls, which sets the safe load on each circuit.
Watts equal amps times volts, so 8 amps at 208 volts comes to 1,664 watts in CoreSite's example. Convert hardware specified in amps this way before comparing it with a per-kW quote.
How Rack Density Changes Colocation Pricing
Rack density raises the monthly bill through the kW each rack draws, Inflect's pricing guide explains. Liquid cooling adds a one-time engineering and installation charge when a facility needs a liquid-cooling retrofit.
Uptime Institute's 2026 survey found average rack density still rising slowly, with more operators reporting peak racks of 30 kW or more. The retail benchmark above prices a 3 to 5 kW rack, well below those densities.
DataBank, a colocation provider, groups AI rack densities into four tiers:
- Traditional: data centers designed for 5 to 8 kW per rack.
- Standard AI deployment: 15 to 25 kW per rack.
- High-density AI: 30 to 50 kW per rack.
- Extreme density: 60 to 100-plus kW per rack, in liquid-cooled systems.
HPE's GB200 NVL72 specification lists a nominal thermal design power (TDP) of 132 kW per rack. Its peak electrical design power runs 1.5 times TDP, about 192 kW, and HPE suggests sizing busways, the overhead power rails, for that peak.
Committed power of 132 kW costs $25,872 per month at the North American wholesale average of $196 per kW, before metered energy. Committing to the 192 kW peak means $37,632 per month, $11,760 more at the same rate.
A single rack falls below the roughly 250 kW wholesale threshold, so treat these figures as unit conversions. Provider quotes set the price for a liquid-cooled rack above 30 kW.
Colocation Network Charges and Bandwidth Billing
Ascendant USA names four bandwidth billing models, and the model decides whether a traffic spike raises the monthly bill:
- Flat rate: a fixed monthly charge for a set amount of bandwidth.
- Metered usage: a charge on the volume of data transferred.
- 95th percentile billing: the provider samples traffic at five-minute intervals, drops the top 5% of readings and bills the highest remaining reading, as Inflect's bandwidth guide describes.
- Burstable billing: a committed baseline, with traffic above it billed at a higher rate per megabit than the baseline.
phoenixNAP, a hosting provider, uses "burstable" as another name for 95th percentile billing, so ask the provider to name the billing method.
Connection fees add a second network line. Inflect's pricing table lists one-time installs of $100 to $500 per connection plus $150 to $300 a month, so ten carrier connections add $1,500 to $3,000 a month.
Colocation Fees Outside the Rate Card, and What to Check in a Quote
Remote hands bill outside the capacity rate, at roughly $75 to $500 per hour depending on the task, per Ascendant USA. Inflect's table quotes $50 to $150 per 15-minute interval, which works out to $200 to $600 an hour.
Ask each provider to answer these ten points in writing:
- Capacity unit: whether the quote prices capacity per rack or per kW, and what the headline rate includes.
- Committed or metered power: which figure the rate uses, because a deployment drawing below its committed kW still pays for the unused kW.
- Overage rate and measurement interval: the price per kW above the contracted threshold, and how often the provider measures draw.
- Energy billing: whether electricity is billed at the utility rate, a marked-up rate or a fixed figure, and whether the PUE overhead appears as its own line.
- Cooling treatment: whether cooling is bundled with power, and whether a high-density rack moves to a different cooling rate.
- Connection fees and bandwidth model: the monthly fee per connection, the bandwidth billing model, and whether IP transit, the internet access a carrier sells, comes bundled.
- Remote hands rate and minimums: the hourly rate, the minimum billable interval and the after-hours premium.
- Annual escalation: whether prices rise by a fixed percentage or track an inflation index such as the consumer price index, since increases compound over a multi-year term.
- Early termination terms: the fee for leaving early, which Inflect reports can reach 50 to 100 percent of the remaining contract value at some providers.
- One-time charges: installation, cabling and cage construction, which fall outside the monthly comparison and can tip a choice between otherwise equal rates.
Which Pricing Model Fits Which Deployment
Deployment size and density decide the pricing model in a quote:
- Enterprise racks of 3 to 5 kW: priced per rack within the retail benchmark band above, so compare quotes on energy billing and bundled services.
- Wholesale blocks from about 250 kW: priced per kW per month, where the choice between committed and metered billing decides how far the bill differs from the benchmark.
- GPU racks above 30 kW: priced per kW in the upper density tiers, where one 132 kW rack converts to a five-figure monthly capacity charge before metered energy.
Contract term, ramp schedules and service-level agreement (SLA) terms also move the effective rate at that scale.
Compare the monthly colocation figure with the break-even utilization for colocation versus cloud before choosing between owned and rented GPUs.