GPU Cloud

AI Vendor Risk Assessment for Infrastructure: What to Evaluate in a GPU Cloud Provider

Run an AI vendor risk assessment on a GPU cloud provider to see what it puts in writing on power, cooling, network fabric, chip supply, compliance evidence and exit terms. A gap in these terms can leave rented GPUs idle or tie the buyer to one provider.

Privian's AI vendor risk assessment framework covers software and model vendors, down to prompt retention and customer-held API keys. The four steps below add the infrastructure checks and end in a six-entry risk record.

What to Request in a GPU Cloud Vendor Risk Assessment

Each step has one main document to request and a label for a missing answer.

StepMain document to requestLabel for a missing answer
1. Power, cooling and chip supplyThe contract's per-rack power and cooling termsContinuity risk
2. Network performanceA measured bandwidth test on the same networkPerformance risk
3. Compliance evidenceRecords of power, network and cooling failure drillsCompliance risk
4. Exit termsThe export, data-transfer fee and handover clausesLock-in risk

Three Inputs for a GPU Vendor Risk Assessment

Collect three sets of documents before the first vendor assessment call:

  1. Facility and hardware documents: the provider's rack specifications, power and cooling design documents and GPU model list for the facility that hosts the contracted capacity.
  2. The draft contract: service-level agreement (SLA) terms, data residency clauses (where the data may be stored), egress fees (the charge for moving data out) and exit provisions.
  3. Workload requirements: planned GPU count, target GPU model, training or inference profile, and data residency obligations.

Step 1: Check the Vendor's Power, Cooling and Chip Supply Risk

The contract fixes the power the provider commits to each rack. GPU delivery depends on chip supply outside the provider's control.

  1. Confirm the per-rack power commitment. Get the committed kW per rack, the burst allowance for short peaks above it and the contract remedy for a shortfall. Check the figure against the servers planned for each rack. An NVIDIA DGX H100 server draws up to 10.2 kW, so four of them can draw about 41 kW at peak, before network switches.
  2. Name the cooling method. A cooling retrofit after signing changes the cost and the delivery date. Record whether the racks use air or direct-to-chip liquid cooling, the heat-removal capacity per rack in kW and the provider's response to a cooling-unit failure.
  3. Get GPU delivery dates in writing. Ask for GPU allocation dates and rack-component lead times for the planned GPU count. Put the dates in the contract with a remedy for a delay.

SemiAnalysis's July 2023 supply-chain research traced the supply limit on Nvidia's leading-edge data-center GPUs to packaging: TSMC's CoWoS step, which joins each GPU die to its high-bandwidth memory.

Record each gap here as a continuity risk.

Step 2: Check Network Performance Risk on the GPU Fabric

Training across several servers depends on the network fabric, the switches and cables that connect the GPUs. Get these figures in writing before signature:

  1. Get the bandwidth ratio between switch layers. The oversubscription ratio compares a switch's bandwidth toward its servers with its bandwidth to the next layer up. A 1:1 ratio lets each server send at its rated link speed at the same time. Ask for the ratio between the GPU switches and the top switch layer, and between compute and storage.
  2. Ask what happens when tenants share a congested link. Request the congestion-control method, the way the network slows senders when a link reaches capacity. Ask which priority level the network gives collective traffic, the data exchanges GPUs run together during training. Get the provider's estimate of how far another tenant's traffic can slow the buyer's jobs.
  3. Request a measured reference run. A reference run is a benchmark job that measures the data rate between GPUs, a figure engineers call bus bandwidth. Ask whether the run used the same GPU model, network generation and server count as the planned workload.

Record a network diagram without measured results as a performance risk.

Step 3: Check the Vendor's Compliance Evidence

SOC 2 Type II is an auditor's report that a provider's security controls worked as designed over a set period.

An ISO/IEC 42001 certificate shows that an organization runs an AI management system, with policies, roles and reviews for its AI work.

Strike Graph's governance analysis finds that a company can hold clean ISO/IEC 42001 and SOC 2 Type II credentials without testing the third-party models in its products. A SOC 2 report won't show the measured fabric bandwidth or the rack power under load.

  1. Log certificates as process evidence. Then ask for test results: reference runs, failure-drill records and capacity tests.
  2. Ask for the vendor's failure-drill history. Record the drill types (power loss, a network split, cooling failure), the dates, the documented outcomes and the incident response times.
  3. Confirm residency terms cover backups and logs. Check that the residency clauses name backups, telemetry and support-ticket data as well as primary storage.
  4. Ask how tenants are kept apart. Get the provider's written method for separating customers on shared servers, storage and networks. Privian's framework lists leakage between customers under data exposure.

Clean certificates with missing drill records still count as a compliance risk.

Step 4: Check the Vendor's Exit Terms and Data Portability

Leaving a GPU provider means moving the data, the training checkpoints that hold the model weights, and the knowledge of how the system runs. Privian's framework calls this vendor dependency: lock-in to one vendor and the cost of an exit.

  1. Confirm export formats and egress costs. Get the supported export formats for datasets and checkpoints, the egress price per terabyte and the notice period before termination. Ask for the data retention period after termination, so the export finishes before deletion. Price an export of the planned datasets and checkpoints at that rate.
  2. Check that checkpoints move to another provider. Confirm that checkpoints export in a format another provider or an on-premises cluster accepts, and test one export early in the engagement. Record the target system and the checkpoint format used in that test.
  3. Name what transfers at handover. The exit terms should list runbooks (step-by-step operating procedures), monitoring settings, infrastructure-as-code files (the scripts that rebuild the setup) and administrator access. Set a handover date and a named owner for each item.

Label a gap in these exit terms a lock-in risk.

The Six-Point Vendor Risk Record

The assessment ends with six entries, each with a risk label and a named owner:

  1. Rack power and cooling: committed kW per rack, cooling method and failure response (continuity).
  2. Supply allocation: written GPU delivery dates for the planned GPU count (continuity).
  3. Fabric proof: oversubscription ratios and a measured reference run (performance).
  4. Compliance evidence: certificates logged as process evidence, drills and tests logged as proof of operation (compliance).
  5. Residency and tenant separation: backups, logs and telemetry named in the contract, plus the written tenant-separation method (compliance).
  6. Exit plan: export formats, egress costs, checkpoint portability and handover scope (lock-in).

Recheck the supply-allocation entry whenever the provider revises its delivery dates. Buyers can compare candidates on the same six entries and take each gap into contract negotiation before signature.

For a dedicated AI data center build, Zettabyte's BOTT model (Build, Operate, Train, Transfer) ends in a planned handover to the customer's team. That phase covers knowledge transfer, documented operating procedures and training for the team to take over the assets and operations.

The same six checks apply to Zettabyte's zCLOUD GPU cloud as a candidate.